1 00:00:13,250 --> 00:00:08,910 you are looking at NOAA's next 2 00:00:18,990 --> 00:00:16,140 NASA's launch services program and ula 3 00:00:20,640 --> 00:00:19,000 are busy encapsulating the spacecraft to 4 00:00:22,560 --> 00:00:20,650 protect it from the unforgiving 5 00:00:26,130 --> 00:00:22,570 atmospheric speeds it will encounter 6 00:00:28,170 --> 00:00:26,140 during launch without this fairing goes 7 00:00:31,980 --> 00:00:28,180 s wouldn't survive the journey into 8 00:00:34,250 --> 00:00:31,990 space thankfully these engineers know 9 00:00:36,900 --> 00:00:34,260 how to keep it safe 10 00:00:38,540 --> 00:00:36,910 engineer proceed with the LP transporter 11 00:00:42,180 --> 00:00:38,550 pad Roger 12 00:00:46,440 --> 00:00:42,190 it's go time the goes s launch window 13 00:00:49,229 --> 00:00:46,450 opens tomorrow ula and LSP have one last 14 00:00:52,260 --> 00:00:49,239 critical procedure to complete get the 15 00:00:54,320 --> 00:00:52,270 entire Atlas 5 stack and its mobile 16 00:01:02,080 --> 00:00:54,330 launch platform to the pad 17 00:01:06,700 --> 00:01:04,390 once it gets there it will be loaded 18 00:01:16,469 --> 00:01:06,710 with rocket fuel and be ready to start 19 00:01:20,670 --> 00:01:18,660 years of intense planning and 20 00:01:24,149 --> 00:01:20,680 coordination are finally rolling to the 21 00:01:26,969 --> 00:01:24,159 pad and the majesty of the atlas v is on 22 00:01:29,490 --> 00:01:26,979 display as it inches its way to liftoff 23 00:01:31,169 --> 00:01:29,500 this is the LC on one performing pretest 24 00:01:33,870 --> 00:01:31,179 briefly this operation is classified 25 00:01:36,240 --> 00:01:33,880 hazardous cryogenics will be loaded ALC 26 00:01:40,499 --> 00:01:36,250 verify count to start at 1947 to live 27 00:01:42,569 --> 00:01:40,509 verified proceeding with the count range 28 00:01:44,789 --> 00:01:42,579 coordinator clear to proceed 29 00:01:47,850 --> 00:01:44,799 launch director you have permission to 30 00:01:50,820 --> 00:01:47,860 lon proceeding with the count Rock 31 00:01:54,660 --> 00:01:50,830 report range status rain screen status 32 00:01:56,490 --> 00:01:54,670 check go out let's both send our range 33 00:01:59,420 --> 00:01:56,500 operations controller reports range 34 00:02:05,429 --> 00:01:59,430 green everything is gold 35 00:02:05,439 --> 00:02:12,720 to 36 00:02:17,860 --> 00:02:15,460 it goes s 37 00:02:19,570 --> 00:02:17,870 watching eye in the sky to join its twin 38 00:02:23,400 --> 00:02:19,580 and providing better forecasts and 39 00:02:27,330 --> 00:02:25,140 Atlas has begun a pitch and yaw maneuver 40 00:02:31,200 --> 00:02:27,340 to steer to its planned path an estimate 41 00:02:33,810 --> 00:02:31,210 of 147 degrees at 35 seconds rocky Karen 42 00:02:35,760 --> 00:02:33,820 goes as for each block one travel faster 43 00:02:38,250 --> 00:02:35,770 than the speed of sound 44 00:02:39,690 --> 00:02:38,260 47 seconds after launch the vehicle will 45 00:02:43,160 --> 00:02:39,700 pass through the area of maximum dynamic 46 00:02:45,110 --> 00:02:43,170 pressure on max-q 47 00:02:46,790 --> 00:02:45,120 stress on the rocket reaches its peak 48 00:02:48,170 --> 00:02:46,800 because of the Rockets velocity and the 49 00:03:00,490 --> 00:02:48,180 resistance created by the Earth's